Four Modules Absorption Package

  • Art.no: i4

Description

ABSOPTRION PACKAGE I4

Absorption package of 4 of eight BM 9 Biomodules. The package includes distribution and ventilation piping and a filter cloth. In the biomodules installed after the Biobox, biocleaning continues before the water is discharged into the soil.

Biomodules are also used if the unloading site is very close to a body of water or if the soil conditions are bad for rock nest absorption (rocky, clayey).

Using biomodules at the unloading site increases the hourly capacity of the system. This expansion method is well suited for locations where a dry toilet is in use.

Characteristics - eight pieces Raita Biomoduli M (BM9) - HS distribution plates 4 pcs distribuationpipe ⌀110 mm, 2.4 m - ventilation pipe ⌀110 mm, 1 m - ⌀110 mm 90° angle - ventilation cap ⌀110 mm - filter fabric approx. 5 m2 - installation requires a space of at least 2600 mm x 1300 mm x 500 mm

More information on the manufacturer's website - see link:

Download the brochure for BioModule cleaner

Download the brochure for BioModule BM9

See also

Yhteensä:
    Checkout
    (0)
    Added to cart