BM9 biomodule purification plant - no electricity, reliable operation

BM9 biomodule purification plant - no electricity, reliable operation

New products card - look more here!

  • Non-electric, small size, simple operation
  • Renewal need after 10-15 years, when only BM9
    modules are renewed
  • Renovation models (old sedimentation wells can be used)
  • Enhanced phosphorus removal with the FB unit

All wastewater from the property is directed to the treatment plant. As a preliminary treatment, the SK unit (precipitation tank) removes fat and solid matter mechanically. BIO cleaning takes place in BM9 biomodules, where organic matter and phosphorus are used as food for microbes. At the same time, nitrogen is reduced with nitrification and denitrification. Purified water is absorbed into the ground or filtered (suopak, kk) and lead to the open ditch. The sludge from the precipitation tank is removed with a tank truck once a year (or as needed).

17.2.2024 8.43
Yhteensä:
    Checkout
    (0)
    Added to cart